Automotive Case Studies
Please find following a selection of completed automotive projects:
Renault Sens Maintenance Logistic Shed
Renault Sens Maintenance Logistic Shed
Client: CIRMAD PROSPECTIVES
Design Architect: MW ARCHITECTURE
Operation Architect & Client Assistant: ELAN
Main Contractor: QUILLE / DV CONSTRUCTION
Roof area : 156 000 m2 in 4 buildings
Bouygues Construction, through its property development subsidiary Cirmad has signed an off-plan contract of 80 mil... more
Peugeot
Location: Coventry
Architect / Consulting Engineer: Bullen Consulting Engineers
Main Contractor: Birse Construction Limited
Perkins Engines Refurbishment
Architect / Consulting Engineer: Rolton Consulting Engineers
Main Contractor: KGM Roofing
Ford Motor Company
Location: Chihuahua, Mexico
Main Contractor: Marhnos Alberici Construction
Project Managers: Posford Duvivier
Sub-Contractors: Instalaciones Tep
Fullflow has successfully completed a number of projects for Ford Motor Company. The largest of which is the extension to the engine factory at Chihuahua, Mexico. Later the ... more
General Motors
Location: Tonawanda, Buffalo, New York State
Main Contractor: Washington Group
The picture above is of GM Motors manufacturing plant in Tonawanda, USA. This is one of the biggest projects that Fullflow have completed to date in the USA.
The building was in need of refurbishment and prior to starting on site, Fullflow personnel carried out site surveys to assess the pipe routing due to ... more
Toyota UK
Location: Derby
Designer: Shimizu (UK) Limited
Management Contractors: Laing Management
Roofing Contractor: Hathaway Roofing Ltd
Pictured above is the Toyota Manufacturing plant in Burnaston, Derby. The 210,000 m² roof area is drained by a Fullflow gravity roof drainage system with 12,000 metres of galvanised steel ... more
Toyota France
Location: Onnaing, France
Architect: SSOE Inc.
Project Management: Bovis Europe
Roofing Contractor: Coverite/SIAC jv
Fullflow are design, manufactured and installed a syphonic system for Toyota in Onnaing France. This system removes rainwater from the 110,400m2 roof area using 655 outlets to just 54 downpipes. At i... more