Case Studies

City Hall - Greater London Authority Building
Click image to enlarge

City Hall - Greater London Authority Building

Location: London, UK
Architect: Foster & Partners
Main Contractor: Axima Building
Syphonic Drainage: Fullflow

Fullflow successfully designed, manufactured and installed a complete syphonic drainage system on this prestigious rounded glass building. The building has an unusual bulbous shape, intended to reduce the building's surface area and thus improve energy efficiency. Located between London Bridge and Tower Bridge, on the south bank of the Thames the iconic building provides an imposing landmark in the capital. Opened in July 2002 is home to the Mayor of London.

Back to Case Studies

© Copyright Fullflow 2012. Company No. 3234676. Site by Verto