Case Studies

Leicester Marriott Hotel
Click image to enlarge

Leicester Marriott Hotel

Leicester Marriott Hotel
Location: Leicester
Consultant: Marriott Construction
Syphonic Drainage: Fullflow

Fullflow designed, manufactured and installed syphonic drainage systems to the Marriott Hotel, Leicester. Opened in May 2006 the seven storey building has a 2700 m2 roof area which is drained by 38 outlets and 14 downpipes. The syphonic drainage systems are designed for an optimum rainfall intensity of 248mm per hour (173mm per hour primary and 75mm per hour via the secondary syphonic system).

Other completed residential projects include the Riverside Quarter, Wandsworth, Greenwich Millennium Village and Whitfield House residential development by York House Construction, Bradford where 85 luxury apartments were developed.

Back to Case Studies