Case Studies

General Motors
Click image to enlarge

General Motors

Location: Tonawanda, Buffalo, New York State
Main Contractor: Washington Group

The picture above is of GM Motors manufacturing plant in Tonawanda, USA. This is one of the biggest projects that Fullflow have completed to date in the USA. 

The building was in need of refurbishment and prior to starting on site, Fullflow personnel carried out site surveys to assess the pipe routing due to access to other services being difficult. 

The 5670 sq.m roof area was drained using 30 x 56mm clamp ring outlets and just one downpipe draining 94.50 litres per second. Approximately 430 metres of pipe was used, with a maximum diameter of 250mm and a minimum diameter of 40mm.